Miller Electric FSU Bus Project

Construction of two fast-charging stations at two different bus stops at FSU's Campus to allow for electric buses to charge at each stop.

Project Overview

Construction of two fast-charging stations at two different bus stops at FSU's Campus to allow for electric buses to charge at each stop.

These state-of-the-art charging stations can take a 35 foot, 28 person electric bus from empty to a full charge in about 10 minutes.

Additional charging stations were also installed at the Star Metro headquarters to charge buses when not in route.

  • Fusce mollis et leo sit amet tincidunt.
  • Seed fermentum velit lacinia pharetra.
  • Hex ac molestie consectetur, metus tellus.
  • Donec fringilla fermentum nibh, velit lacinia.
  • Fusce mollis et leo sit amet tincidunt.
  • Seed fermentum velit lacinia pharetra.
  • Hex ac molestie consectetur, metus tellus.
Project Description
Completion DateAugust 2017
Project Location