Daily’s Place Amphitheater and Flex Field
Birken Construction acted as a General Contractor beneath Hunt/ Danis on this project.
Project Overview
Our responsibilities included construction of the 15,000 SF back-of-house building, containing the artists rooms, artist lounge, tour lounge, marshalling area, security, loading dock, Rimrock lounge, and additional mixed use spaces.
Birken was also responsible for the construction of the 2,000 SF building on state left where the audio, visual, electrical, and other stage related facilities were housed.
In addition to these buildings, Birken also completed the masonry scope of work on the bowl, the triodetic stage structure, painting, renovation of the west restroom building, glass floor install, door and hardware scope of work, escalator canopy demolition and revisions, and hanger door closure panels. Birken also self-performed the concrete scope of work for the flat-work in the entire facility.
This project was completed on schedule and on budget.
|
|
Project Description
Completion Date | August 2017 |