Visitor Locker Room Relocation

Birken Construction was contracted by the Jacksonville Jaguars and the City of Jacksonville to construct a new visitor locker room at the event level of TIAA Bank Field.

Project Overview

This project consisted of construction of a new visitor locker room and associated interview room on the event level of the existing TIAA Bank Field Stadium, total area of approximately 10,500SF. The new spaces included new lockers, showers/toilets/grooming areas, and small athletic training areas. Significant demolition and replacement of the existing event level floor slab is required along with an extension of the. Birken was able to transform this space from the grounds department storage area to the finished visitor’s locker room in under 4 months.

  • Fusce mollis et leo sit amet tincidunt.
  • Seed fermentum velit lacinia pharetra.
  • Hex ac molestie consectetur, metus tellus.
  • Donec fringilla fermentum nibh, velit lacinia.
  • Fusce mollis et leo sit amet tincidunt.
  • Seed fermentum velit lacinia pharetra.
  • Hex ac molestie consectetur, metus tellus.
Project Description
Completion Date 2019
Project Location
Scroll to Top